Welcome to Pylon Technologies, Co. Ltd,

                        500kwh Pylontech Battery ESS in North Asia

                        Smart Mirco Grid ESS

                        100kva Diesel Generator,

                        150kw PV Power Plant,

                        500kwh Pylontech Battery ESS

                        220kWh energy storage system in Australia

                        Date: 9. 2018

                        Location: Australia

                        Purpose: Commercial System

                        Config.: 9 racks * H1 system, 324kWh

                        Energy Source: PV + Grid

                        220kWh energy storage system for hotel in Brazil

                        Date: 07. 2018
                        Purpose: Commercial ESS (Hotel)
                        Config.: 2x Powercube M1 / 220KWh
                        Inverter: SINEXCEL PCS 100KW
                        Energy Source: PV + Grid

                        108.9kWh High Voltagy System installed in Czech Republic

                        Date: 11. 2017
                        Location: Czech Republic
                        Purpose: Peak Shaving
                        Config.: 1*Powercube M1, 108.9kWh
                        Energy Source: PV

                        49.8 kWh High Voltage System installed in China

                        Date: 10. 2016
                        Location: Shanghai, China
                        Purpose: EV charge platform
                        Config.: 14*H48074, 49.8kWh
                        Energy Source: PV

                        Photovoltaic ESS Charging Pile - 150KW/150KWh

                        2016 Photovoltaic ESS Charging Pile integrated site - 150KW/150KWh

                        Project Site: Shanghai, China

                        Objective: Solution of off grid, PV and charging pile for EV car
                        Characteristic: mixture application of LFP battery system and Three Element battery system.

                        2017 Micro-grid ESS in industry park - 500kW/500kWh

                        2017 Micro-grid ESS in industry park - 500kW/500kWh

                        A grid connected energy storage system in a industry park in China

                        Objective: peak load shifting, the load smoothing, and the emergency power supply in the factory yard.
                        Characteristic: grid connected, high power rate charge/discharge

                        2017 Island Off Grid ESS - 120kW/624kWh

                        2017 Island Off Grid ESS - 120kW/624kWh
                        An island of Southeast Asia
                        Off-grid (micro-grid)
                        Objective: Island micro-grid ESS
                        Characteristic: micro-grid system include hybrid energy system (PV and diesel genset)